SECURE is a workflow based system
In SECURE, the work name & work codes are received from Mahatma Gandhi NREGA MIS to the concerned Estimate Creator login after the approval of Labour budget. The AE/Overseer of the Block/GP creates the detailed estimate with necessary details. As per the Government procedure adopted by the state, the above estimates are accorded AS/TS sanctions and subsequently AS/TS slips are generated from the system. SECURE soft generates Detailed Project Report (DPR) which includes AS/TS No, AS/TS date, total estimate amount, total material Cost & list of materials used in the estimate with quantity, total semi skilled, Skilled manpower cost, total unskilled wages, activity carried out in each work, No of man days( Unskilled manpower). For creating an estimate every state is being used their own LMR rates, SOR as per their state specific rule adopted for MGNREGS works.
- According AS/TS sanctions in SECURE
- All details related to AS/TS, activity & material Generation
Services
SECURE is managed by administration module for user creation, office management, and data entry of SoR / LMR, and uploading photographs, news & Government Orders. User ids are created based on the staff details of the GP, Block, District & State. After According AS/TS sanctions in SECURE, all details related to AS/TS, activity & material may be pulled from SECURE to Nregasoft through web services. This will eliminate re-entering the details like AS/TS No, AS/TS date, total estimate amount, total material Cost, total semi skilled Cost, total Skilled cost, total unskilled wages, Activity carried out in each work, No of man days in Nregasoft. Work allocation and muster roll generation should takes place in the MIS after completing the above processes.
Estimate Creation
Estimates are formulated using state-specific LMR rates and SOR, ensuring compliance and relevance to MGNREGS works
Spill Over
Recalculation of Previous Year Estimate with new unskilled wage rate
Revision of Estimate
Estimate revisions may occur due to changing site conditions, necessitating updates to data/specifications or adjustments in quantities
AS/TS Approval
The system simplifies the process of obtaining AS/TS sanctions, with automatic generation of relevant slips.
State-Specific Adaptability
SECURE is highly adaptable, catering to the unique workflow, rates, and procedures of different states.
State-Specific SoR
Estimates are formulated using state-specific LMR rates and SOR, ensuring compliance and relevance to local MGNREGS works.
Enrolled States
ARUNACHAL PRADESH
First approval: 0
Final approval: 0
MADHYA PRADESH
First approval: 284321
Final approval: 277232
KERALA
First approval: 143091
Final approval: 139230
ANDHRA PRADESH
First approval: 514760
Final approval: 468150
KARNATAKA
First approval: 140688
Final approval: 132528
UTTAR PRADESH
First approval: 375115
Final approval: 351130
TAMIL NADU
First approval: 113518
Final approval: 112342
BIHAR
First approval: 207758
Final approval: 189702
JHARKHAND
First approval: 208934
Final approval: 197920
RAJASTHAN
First approval: 60691
Final approval: 23787
SIKKIM
First approval: 4
Final approval: 2
TRIPURA
First approval: 40027
Final approval: 39239
ODISHA
First approval: 128170
Final approval: 100451
CHHATTISGARH
First approval: 33620
Final approval: 20290
MEGHALAYA
First approval: 12258
Final approval: 11416
UTTARAKHAND
First approval: 14919
Final approval: 13605
HARYANA
First approval: 7892
Final approval: 6456
MANIPUR
First approval: 10234
Final approval: 9838
WEST BENGAL
First approval: 0
Final approval: 0
JAMMU AND KASHMIR
First approval: 125846
Final approval: 124638
ANDAMAN AND NICOBAR
First approval: 0
Final approval: 0
MAHARASHTRA
First approval: 106028
Final approval: 92232
NAGALAND
First approval: 2974
Final approval: 2966
ASSAM
First approval: 16426
Final approval: 9842
GUJARAT
First approval: 30891
Final approval: 25031
PUNJAB
First approval: 13642
Final approval: 10379
HIMACHAL PRADESH
First approval: 11393
Final approval: 10509
MIZORAM
First approval: 15881
Final approval: 15881
TELANGANA
First approval: 238842
Final approval: 219598
GOA
First approval: 348
Final approval: 347
PUDUCHERRY
First approval: 646
Final approval: 601
LADAKH
First approval: 3392
Final approval: 3354
Features
SECURE offers advanced features for creating detailed estimates and reports, adapting to state-specific guidelines and rates. The system enhances transparency, accountability, and speed in project approval and monitoring, embodying e-governance principles.
Estimate Creation
Estimates are formulated using state-specific LMR rates and SOR, ensuring compliance and relevance to MGNREGS works
Structural Drawing
Pre-drawn work structural drawing template with customizable measurements for all proposed works.
Estimate accuracy & Time
Rapid estimate creation and approval processes reduce delays significantly & Automatic recalculations for LMR changes ensure continued accuracy.
SOR & rates
Estimates are formulated using state-specific LMR rates and SOR, ensuring compliance and relevance to local MGNREGS works.
File Movement
Track estimate status and file movement at any level for complete oversight. And adaptable, catering to the unique workflow, and procedures of different states.
Frequently Asked Questions
- What is DSoR?
The Delhi Schedule of Rates (DSR) is a technical document that is published by the Central Public Works Department (CPWD). It is a list of rates for various items and works in the construction industry. The DSR is a crucial document that plays a significant role in construction projects throughout India.
- What is market rate?
Items which are not available in the DSoR,like to use those items in the estimate for MGNREGA works.
- Works available in SECURE ?
Only approved works are receiving in SECURE from Nregasoft (MIS).
- What is Non Scheduled items/Observed Data?
Data which is not available in CPWD chapters or State SoR
- Pull works is used in which scenario?
For pulling the work from MIS to SECURE